The factories of the total surface 45 000 m2, max. voltage 12 MW.
Scope of works:
SN/NN station installation
installation of six transformators up to 2000 kVa with bus bars Siemens 5000 A
delivery and installation of switchboard - SIMOSEC 24kV, 630 A
prefabrication and delivery of the switchboards - NN SIVACON 5000A
building switchboards
three-phase power systems
lightning installations
lightning rods
fire protection system installation
LAN network and telephone network
facility building
Outdoor networks:
building of cable ducting
SN cable routing
outdoor lightning installation