Preparation of internal electric installations along with the power feeder and retrofittion of the switchboard in the building G7.
Modernization of the historic castle (Upper Castle) and extension of the staff building
Scope of works:
delivery and installation of SN switchboard
delivery and installation of NN switchboard
lightning installations
emergency lightning installation
three-phase power system
outdoor lightning installation
illumination of Upper Castle
lightning rod installation
conduits for electrical installations
Wiring works performance and AKPiA for the second line glass wool for Saint Gobain.
Scope of works:
Expansion of SN switchboard
AKPIA equipment installation
installment of compressed-air system for AKPiA
buliding of fiber-optic network and Ethernet network
post installment study and start-up
prefabrication, delivery and installment of the main switchboards MCC SIVACON - 4000 A
delivery and installation of bus bars Siemens LDA up to 4000 A
installation of switchboard for powering technology
routing of cabling and wiring for powering technology and AKPiA equipment
Delivery of machinery along with installation and cabling, as well as preparation of elecrical installations.