The comprehensive preparation of electric installations; low and high voltage. Preparation of the execution project.
Hall no 2, 3, 4 with the total surface of 46, 000 square meters
Scope of works:
installation od LV/MV stations in the halls no 2, 3 and 4, as well as the expansion of the LV switchboard in the hall no 1.
installation of 5 transformers 3150 kVA with bus bars Siemens 5000A
installation of 4 transformers 2500 kVA with bus bars Siemens 4000A
installation of a one transformer1600 kVA along with the bus bar Siemens 2500A
delivery and installation of he switchboard SIMOSEC 24kV, 630 A
prefabrication and delivery of eight LV switchboards SIVACON 5000A
building switchboards
three-phase power system installations
lightning installations
fire protection system installation
gas detection system
LAN network and phone network
office-social building
Outside networks:
building of cable ducting
LV cable routing
preparation of the outside lightning
The factories of the total surface 45 000 m2, max. voltage 12 MW.
Scope of works:
SN/NN station installation
installation of six transformators up to 2000 kVa with bus bars Siemens 5000 A
delivery and installation of switchboard - SIMOSEC 24kV, 630 A
prefabrication and delivery of the switchboards - NN SIVACON 5000A
building switchboards
three-phase power systems
lightning installations
lightning rods
fire protection system installation
LAN network and telephone network
facility building
Outdoor networks:
building of cable ducting
SN cable routing
outdoor lightning installation
Two ten-storey buildings (400 flats) with the underground garage, installed power 6,7 MVA.
Scope of works:
main NN switchboard,
floor switchboard,
wiring,
fire alarm system installation,
lightning installation