The comprehensive preparation of electric installations; low and high voltage. Preparation of the execution project.

Hall no 2, 3, 4 with the total surface of 46, 000 square meters

Scope of works:

    installation od LV/MV stations in the halls no 2, 3 and 4, as well as the expansion of the LV switchboard in the hall no 1.
    installation of 5 transformers 3150 kVA with bus bars Siemens 5000A
    installation of 4 transformers 2500 kVA with bus bars Siemens 4000A
    installation of a one transformer1600 kVA along with the bus bar Siemens 2500A
    delivery and installation of he switchboard SIMOSEC 24kV, 630 A
    prefabrication and delivery of eight LV switchboards SIVACON 5000A
    building switchboards
    three-phase power system installations
    lightning installations
    fire protection system installation
    gas detection system
    LAN network and phone network
    office-social building

Outside networks:

    building of cable ducting
    LV cable routing
    preparation of the outside lightning

The factories of the total surface 45 000 m2, max. voltage 12 MW.



Scope of works:
SN/NN station installation

    installation of six transformators up to 2000 kVa with bus bars Siemens 5000 A
    delivery and installation of switchboard - SIMOSEC 24kV, 630 A
    prefabrication and delivery of the switchboards -  NN SIVACON 5000A
    building switchboards
    three-phase power systems
    lightning installations
    lightning rods
    fire protection system installation
    LAN network and telephone network
    facility building

Outdoor networks:

    building of cable ducting
    SN cable routing
    outdoor lightning installation

Two ten-storey buildings (400 flats) with the underground garage, installed power 6,7 MVA.


Scope of works:

    main NN switchboard,
    floor switchboard,
    wiring,
    fire alarm system installation,
    lightning installation





ETP S.A. w restrukturyzacji
Siedziba w Katowicach
ul. Siemianowicka 5a
40-301 Katowice

Zakład w Bierawie
ul. Gliwicka 8
47-240 Bierawa

NIP: 634-000-40-17
REGON: 271431626
KRS: 0000055522

Sąd Rejonowy Katowice-Wschód w Katowicach
VIII Wydział Gospodarczy
Kapitał zakładowy 1.192.672 zł
wpłacony w całości