RÓW POLSKI – REGULATION AND EMBANKING AT KM 8+100 - 1+100 WITH THE RYDZYNA WATER RESERVOIR.
Scope of works:
The execution of construction works related to the construction of an earthwork water reservoir with a capacity of 0.96 million m3 and a surface area of 41.70 ha.
THE CONSTRUCTION OF A TRACTION MACHINE AND A SHAFT SIGNALLING SYSTEM TOGETHER WITH THE LAUNCH OF SHAFT-HOISTING IN THE SOUTHERN RANGE OF SHAFT I IN JSW S.A. "BUDRYK" COAL MINE
The scope of the contract implemented by the ETP S.A. includes the preparation of the technical documentation and design of specific technologies for the works.
In the traction machine room: making foundation for the machine in the transformer room, making construction installations in the building, crane mounting, ceiling; as well as construction and installation works in the transformer room or mechanical and electrical workshops.
THE CONSTRUCTION OF THE WIÓRY RESERVOIR
Scope of works:
General contracting for water reservoir of 35.0 million m3 volume,
earth embankment with clay core and injection sealed rock substrate,
cement screen.
REDUCTION OF FLOOD HAZARD IN LUBLIN VOIVODESHIP BY CONSTRUCTION OF THE SMALL STORAGE RESERVOIR IN KRASNYSTAW.
Under the "design and construct" formula ETP company built a small storage reservoir of significant importance for the protection of the environment and the economic conditions of the town of Krasnystaw. The construction of the reservoir positively affected tourist and recreational values of the region. It helped balance water management, which contributed to better flood protection. It allowed feeding the river with water during dry seasons and improved conditions for the development of valuable specimens of fauna and flora due to a vegetation filter in the reservoir backwater.
Construction works related to implementation of the water reservoir: