Scope of works:

    MV/LV switchgears instalation in the warehouse buildings:1,3.
    installation of 2 transformators 2500 kVA along with bus bars 2500A and 5000A
    installation of 5 transformators 1600 kVA
    delivery and installation of switchboards SIMOSEC  21kV, 630 A
    prefabrication and delivery of 6 switchboards NN SIVACON up to 5000A
    buildng switchboards
    three-phase power system instalation
    lightning system installations
    fire protection system
    gas detection system
    LAN network and telephone system
    office and employee facilities


Outside networks:

    cable ducting building
    MV cable routing
    outside lightning installation


Modernisation of the electrical power and heating station along with the project.



Electrical power and heating station equipped in:

    2 utility boilers,
    generator 17,5 MVA/6,3 kV.

Scope of works:

    the switchboard RGNN 4-section, 22-filed, 2 SZR, 2500A
    fields of the main switchboard LV
    power take off of the generator 6kV
    three-phase power system installations
    lightning installations
    fire protection system installation
    phone instalation
    social building

F building – total surface 55 000 m2.

Scope of works:

    delivery and installation of SIMOSEC 24kV 630 A switchboard for TS3 i TS4 station
    installation of 9 transformers 1250 kVA
    prefabrication and delivery of eight NN SIVACON switchboards up to 5000 A
    prefabrication and delivery of sub-distribution boards
    delivery and installation of emergency lightning battery
    lightning and three-phase power instalation system

low-voltage installations

    wiring for the whole building with the surface of 120 000 m2
    installation SAP Esser systemr
    inside and outside LAN network installation
    preparation of the outside backbone (optical fiber network, outside cabling)

internet network routing

Warehouse, office and employee facilities, total surface: 32 000 m2

Scope of works:
SN/NN switchboard installation

    delivery an installation of a transformer
    delivery and installation of SN switchboard
    prefabrication and delivery of NN SIVACON switchgear
    building switchboard
    three-phase power systems
    lightning systems installation
    lightning rod installation

outside wiring:

    building of cable ducting
    SN cable routing





ETP S.A. w restrukturyzacji
Siedziba w Katowicach
ul. Siemianowicka 5a
40-301 Katowice

Zakład w Bierawie
ul. Gliwicka 8
47-240 Bierawa

NIP: 634-000-40-17
REGON: 271431626
KRS: 0000055522

Sąd Rejonowy Katowice-Wschód w Katowicach
VIII Wydział Gospodarczy
Kapitał zakładowy 1.192.672 zł
wpłacony w całości