Scope of works:
MV/LV switchgears instalation in the warehouse buildings:1,3.
installation of 2 transformators 2500 kVA along with bus bars 2500A and 5000A
installation of 5 transformators 1600 kVA
delivery and installation of switchboards SIMOSEC 21kV, 630 A
prefabrication and delivery of 6 switchboards NN SIVACON up to 5000A
buildng switchboards
three-phase power system instalation
lightning system installations
fire protection system
gas detection system
LAN network and telephone system
office and employee facilities
Outside networks:
cable ducting building
MV cable routing
outside lightning installation
Modernisation of the electrical power and heating station along with the project.
Electrical power and heating station equipped in:
2 utility boilers,
generator 17,5 MVA/6,3 kV.
Scope of works:
the switchboard RGNN 4-section, 22-filed, 2 SZR, 2500A
fields of the main switchboard LV
power take off of the generator 6kV
three-phase power system installations
lightning installations
fire protection system installation
phone instalation
social building
F building – total surface 55 000 m2.
Scope of works:
delivery and installation of SIMOSEC 24kV 630 A switchboard for TS3 i TS4 station
installation of 9 transformers 1250 kVA
prefabrication and delivery of eight NN SIVACON switchboards up to 5000 A
prefabrication and delivery of sub-distribution boards
delivery and installation of emergency lightning battery
lightning and three-phase power instalation system
low-voltage installations
wiring for the whole building with the surface of 120 000 m2
installation SAP Esser systemr
inside and outside LAN network installation
preparation of the outside backbone (optical fiber network, outside cabling)
internet network routing
Warehouse, office and employee facilities, total surface: 32 000 m2
Scope of works:
SN/NN switchboard installation
delivery an installation of a transformer
delivery and installation of SN switchboard
prefabrication and delivery of NN SIVACON switchgear
building switchboard
three-phase power systems
lightning systems installation
lightning rod installation
outside wiring:
building of cable ducting
SN cable routing