THE CONSTRUCTION OF A TRACTION MACHINE AND A SHAFT SIGNALLING SYSTEM TOGETHER WITH THE LAUNCH OF SHAFT-HOISTING IN THE SOUTHERN RANGE OF SHAFT I IN JSW S.A. "BUDRYK" COAL MINE
The scope of the contract implemented by the ETP S.A. includes the preparation of the technical documentation and design of specific technologies for the works.
In the traction machine room: making foundation for the machine in the transformer room, making construction installations in the building, crane mounting, ceiling; as well as construction and installation works in the transformer room or mechanical and electrical workshops.
The remaining scope of works:
– open building shell: foundations, assembly of the frame with building shell
– closed building shell: windows and door joinery
Other works: land development, central heating, storm water sewage system, sanitary sewage system, water system, cable duct